Economic performance & plant status
Forecast pending
Actual cost today
€826
Day-ahead plan €17,660 · intraday €2,844
Heat delivered
15.9 MWh
Avg load 0.66 MW
CO₂ emitted
16.9t
1,066 kg/MWh heat
Cost trajectory — plan vs actual
Day-aheadIntradayActual
Production right now
Heat Pump 12.78 MW / 4.00 MW
Heat Pump 20.00 MW / 4.00 MW
Wood / Pellets Incinerator3.00 MW / 3.00 MW
Gas Boiler2.17 MW / 4.25 MW
Storage state of charge31.3 MWh · 50%
Limits 8% – 100% SoC
Real COP
3.73
Carnot COP
6.44
Supply temp
56.0 °C
Outside temp
4.9 °C
Heat storage state of charge
Network status
- Current Return Temperature
- 51.0 °C
- Current Supply Temperature
- 65.0 °C
- Current Network Load
- 21.3 MW
- Storage Tank 1 SoC
- 50.0 %
- Storage Tank 2 SoC
- 50.0 %
- HP Unit 1 Current Power
- 1.3 MW
- HP Unit 2 Current Power
- 0.0 MW
- Boiler Pellets Current Power
- 0.8 MW
- Boiler Gas Current Power
- 0.0 MW
- Network Max Load
- 37.5 MW
- Network Thermal Inertia
- 37.5 MWh
- Supply Temp Min Hard Limit
- 45.0 °C
Return temp 0.0 °C · mass flow 0.0 kg/s
Open alarms
- Forecast Confidence Below Threshold2026-03-15 06:42:00 · Forecast Uncertainty · WARNING
- Data Gap Detected2026-03-15 12:10:00 · Data Quality · CRITICAL
- Data Gap Detected2026-03-16 02:33:00 · Data Quality · WARNING
- Electricity Price Spike2026-03-16 12:30:00 · Market Price · WARNING
Latest operator actions
- System started2026-03-15 00:00:00 · O. System (Automated) · SYSTEM_START
- User logged in2026-03-15 00:06:00 · A. Mueller (Operations Technician) · LOGIN
- Viewed dashboard2026-03-15 00:12:00 · A. Mueller (Operations Technician) · VIEW_DASHBOARD
- Executed automatic optimization2026-03-15 00:15:00 · A. Mueller (Operations Technician) · AUTO_OPTIMIZATION
- User logged in2026-03-15 06:30:00 · M. Vogt (Senior Operations Manager) · LOGIN