Total heat output
12.36 MW
Demand 12.36 MW
Heat pump share
65%
COP 3.73 · 2.14 MW electric
Storage
67%
41.6 MWh · charging 2.50 MW
Supply / return
65.0 / 51.0°C
Network header
Cost rate
€445/h
Current dispatch
Heat pump 1
Air / water heat pump
running
3.99MW of 4.00 MW · 100% load
Real COP
3.73
Carnot COP
6.44
Electric input
1.07 MW
Temp lift
51.1 K
Source temp
4.9 °C
Power price
25.4 €/MWh
Heat pump 2
Air / water heat pump
running
3.99MW of 4.00 MW · 100% load
Real COP
3.73
Carnot COP
6.44
Electric input
1.07 MW
Temp lift
51.1 K
Source temp
4.9 °C
Power price
25.4 €/MWh
Wood / pellets incinerator
Biomass boiler
running
3.00MW of 3.00 MW · 100% load
Efficiency
88 %
Fuel input
3.41 MW
Pellet price
55 €/MWh (fixed)
Fuel cost
€188/h
Supply temp
65.0 °C
Min load
0.90 MW
Gas boiler
Peak / backup boiler
running
1.38MW of 20.00 MW · 7% load
Efficiency
90 %
Fuel input
1.53 MW
Gas price
51.3 €/MWh
Fuel cost
€78/h
CO₂ price
40.0 €/t
Supply temp
65.0 °C
Heat storage
Thermal buffer (2 tanks)
running
41.60MWh of 62.50 MWh · 67% charged
State of charge
41.6 MWh
SoC
67%
Mode
Charging
Flow
2.50 MW
Capacity
62.5 MWh
Return temp
51.0 °C

Plant schematic & sector coupling

Ground water4.9 °CGrid2.14 MW · 25.4 €/MWhWood pellets55 €/MWh fixedGas supply51.3 €/MWhnetwork headerHeat load12.36 MW65.0 / 51.0 °Cground waterpowerHeat pump 13.99 MWautolimit4.00 MWPRef3.99 MWPPlan3.99 MWmodeautoground waterpowerHeat pump 23.99 MWautolimit4.00 MWPRef3.99 MWPPlan3.99 MWmodeautopelletsWood incinerator3.00 MWautolimit3.00 MWPRef3.00 MWPPlan3.00 MWmodeautogasGas boiler1.38 MWautolimit20.00 MWPRef1.38 MWPPlan1.38 MWmodeautoHeat storage41.6 MWh · 67 %chargingcharge 2.50 MWlimit62.50 MWhPRef2.50 MWPPlan2.50 MWmodechargingHeatElectricityFuelSignals · limit / PRef / PPlan / mode